Major Tech Company in Mountain View

Enpowered has served as a Major Tech Company’s commissioning authority for 17 buildings in past and active projects in and around its Mountain View campus totaling over 2.25 million square feet. These projects have all been unique in their individual requirements, but have all shared exceptionally fast-tracked commissioning schedules.

Front of Laguna Honda Hospital

Project Scope

Two example buildings on the Tech Company’s main campus were LEED Commercial Interiors projects, an office building of 63,800 square feet and a warehouse building with office space of 37,800 square feet which both achieved LEED Gold certification. These buildings included a number of innovative systems, including a unique building-integrated photovoltaic system for which Enpowered developed a custom testing plan. This project was especially unique because Enpowered was brought into the project exceptionally late in the process, but despite the short timeline, Enpowered was able to adapt, satisfy the LEED Fundamental Commissioning requirements, and facilitate a LEED Gold certification.

Project Scope

Two example buildings on the Tech Company’s main campus were LEED Commercial Interiors projects, an office building of 63,800 square feet and a warehouse building with office space of 37,800 square feet which both achieved LEED Gold certification. These buildings included a number of innovative systems, including a unique building-integrated photovoltaic system for which Enpowered developed a custom testing plan. This project was especially unique because Enpowered was brought into the project exceptionally late in the process, but despite the short timeline, Enpowered was able to adapt, satisfy the LEED Fundamental Commissioning requirements, and facilitate a LEED Gold certification.

Additional Projects

Enpowered has also worked on a total of four buildings at the Tech Company’s new Shorebird campus in Mountain View, near their main campus. These four buildings total 210,500 square feet; facilities include private and open offices, conference rooms, kitchens, and warehouse space. These projects are unique because they were all fast-track commissioning projects, with only 14 months between initial design and final occupancy. For each of these buildings, Enpowered performed all tasks included in LEED Fundamental and Enhanced Commissioning requirements for the building HVAC systems and controls, lighting, domestic hot water, and renewable energy systems, as well as additional commissioning services beyond LEED commissioning to satisfy the Tech Company’s unique project requirements.

K

Project Size (sqft) 715,000

K

2 LEED Gold Certified Buildings

K

Building-integrated Photovoltaic System

K

LEED Fundamental Commissioning Requirements

K

Advanced HVAC Control Systems

K

Fast-track Commissioning Projects

Enpowered was selected as the sole commissioning agent for the large TechCorners campus project, a large collection of six buildings totaling 941,000 square feet with a total project budget exceeding $300 million. This project is truly unique as the first five whole-building retrofits, totaling 715,000 square feet, are proceeding from design to occupancy in a mere 10 months. The first five buildings were fully renovated with major interior rehabilitation and site improvements, and were occupied in late 2014. The sixth building was new construction with tenant improvement and was occupied in early 2015. The campus includes office space, office support space, food services, and unique amenity spaces.

At all six buildings, the systems that Enpowered is commissioning for LEED include building HVAC systems (including kitchen exhaust systems), HVAC control systems (including Melink system), lighting controls, domestic hot water systems, irrigation systems, and renewable energy systems. In addition, Enpowered is involved with CA Title 24 commissioning compliance, and enhanced metering systems, and the Tech Company’s project requirements and Green Goals beyond normal LEED commissioning.

Check Out Some of Our Other Projects

SFPUC Main Headquarters Building

Learn about Enpowered Solution's work as the Commissioning Authority for the new San Francisco Public Utilities Commission Headquarters which has achieved LEED Platinum Certification.

Commissioning
San Francisco International Airport

Enpowered was the Commissioning Authority for the prestigious Terminal 2 Renovation at the San Francisco International Airport that achieved LEED Gold certification.

Commissioning
SFPUC Contract CS 193.C

Enpowered conducted retro-commissioning projects at 1 South Van Ness and the Visual Arts Building at City College of San Francisco under this contract, identifying low and no-cost energy-saving measures.

Commissioning
SFPUC Contract CS 127.A

Under this contract, Enpowered Solutions has conducted energy audits, commissioning at new buildings, and provided LEED support services at San Francisco municipal facilities powered by the SFPUC.

Commissioning
Foothill De Anza Community College District

Enpowered acted as Commissioning Authority for the new Mediated Learning Center (MLC) at De Anza College and the new Physical Sciences and Engineering Center (PSEC) at Foothill College.

Commissioning
Major Tech Company in Mountain View

Enpowered has served as a Major Tech Company’s commissioning authority for 17 buildings in past and active projects in and around its Mountain View campus totaling over 2.25 million square feet.

Commissioning
previous arrowprevious arrow
next arrownext arrow
Slider
Slider