Enpowered acted as Commissioning Authority for the new Mediated Learning Center (MLC) at De Anza College and the new Physical Sciences and Engineering Center (PSEC) at Foothill College, both members of the Foothill De Anza Community College District. From the early stages of design, Enpowered provided design review services, controls logic integration services, submittal reviews, construction site verification, functional performance testing, review of operating & maintenance manuals, and prepared all LEED® Commissioning submittals.

Front of Laguna Honda Hospital

Project Scope

The commissioning process for this project was executed seamlessly with the General Contractor’s master project schedule. Our CxA formed a partnership with the General Contractor’s Commissioning Coordinator to integrate commissioning activities into the master schedule, as well as to develop a detailed start-up and commissioning schedule for all MEP equipment. Regular meetings were held with project managers from all contracted trades, to keep the entire team informed of the start-up and commissioning process, from the very beginning of the Construction Phase.

Project Scope

The commissioning process for this project was executed seamlessly with the General Contractor’s master project schedule. Our CxA formed a partnership with the General Contractor’s Commissioning Coordinator to integrate commissioning activities into the master schedule, as well as to develop a detailed start-up and commissioning schedule for all MEP equipment. Regular meetings were held with project managers from all contracted trades, to keep the entire team informed of the start-up and commissioning process, from the very beginning of the Construction Phase.

Innovative Facilities

The MLC is an innovative facility designed to maintain comfortable conditions nearly year-round through the use of a one-of-a-kind buoyancy-driven ventilation system. The facility was recently certified LEED® Platinum and is on the cutting edge in the application of sustainable building technologies, including a large solar hot-water generating system with thermal energy storage.

K

Design Review Services

K

Controls Logic Integration

K

Building-Level Control Sequencing

K

LEED® Commissioning Submittals

Enpowered performed complex trend data analysis to ensure that adequate airflow rates were maintained by the buoyancy-driven air intake shafts, providing comfortable, open teaching space for thousands of students.

PSEC, a teaching center for the physical sciences, comprises a total of 65,800 square feet and consists of three buildings. In addition to classroom and office spaces, the largest building houses five chemistry labs, two physics labs, a materials and nanoscience lab, and a multipurpose lab. The project is expected to be complete in late 2012 and is targeting a LEED® Silver Rating from the US Green Building Council.

The PSEC project has benefitted from a complex building information model (BIM), which enabled the design and construction team to minimize integration issues with a very complicated supply and exhaust ductwork system supplying the laboratory spaces. Enpowered’s review of the fume hood control sequence integration with the overall building-level control sequences helped avoid construction delays with the controls integration later in the project.

Check Out Some of Our Other Projects

SFPUC Main Headquarters Building

Learn about Enpowered Solution's work as the Commissioning Authority for the new San Francisco Public Utilities Commission Headquarters which has achieved LEED Platinum Certification.

Commissioning
San Francisco International Airport

Enpowered was the Commissioning Authority for the prestigious Terminal 2 Renovation at the San Francisco International Airport that achieved LEED Gold certification.

Commissioning
SFPUC Contract CS 193.C

Enpowered conducted retro-commissioning projects at 1 South Van Ness and the Visual Arts Building at City College of San Francisco under this contract, identifying low and no-cost energy-saving measures.

Commissioning
SFPUC Contract CS 127.A

Under this contract, Enpowered Solutions has conducted energy audits, commissioning at new buildings, and provided LEED support services at San Francisco municipal facilities powered by the SFPUC.

Commissioning
Foothill De Anza Community College District

Enpowered acted as Commissioning Authority for the new Mediated Learning Center (MLC) at De Anza College and the new Physical Sciences and Engineering Center (PSEC) at Foothill College.

Commissioning
Major Tech Company in Mountain View

Enpowered has served as a Major Tech Company’s commissioning authority for 17 buildings in past and active projects in and around its Mountain View campus totaling over 2.25 million square feet.